Bristol St & Esther Blvd Drainage Improvements

City Job No. 425-D2-1910

This contract will include, replacement of existing storm sewer collection system to increase capacity to Burton Creek,  new storm sewers to be installed within existing right-of-ways. Reconstruction of concrete streets where new storm sewer will be installed, resizing and addition of storm inlets to increase capture capacity, and 2D modeling.

Bristol & Esther Project Map in PDF Format

General Information

Design

  • Funding Source: Drainage Fee
  • Design Engineer: Walker Partners LLC
  • Contract Amount: $354,500.00
  • Status: Design is complete.
  • Updated: 10/13/22

Construction

  • Funding Source: Drainage Fee
  • Contractor: Texcon General Contractors
  • Contract Amount: $ 7,264,127.39
  • City Inspector: TBD
  • Status: Construction contract was approved by City Council on 3/5/24.
  • Updated: 03/13/24

 

Hillside Oaks & Old Oaks Drainage Improvements

 

General Information

  • Project Manager/City Contact: Kelly Sullivan, P.E.
  • Alternate City Contact: Sam Vernon, P.E., C.F.M.

Design

  • Funding Source: Drainage Fee
  • Design Engineer: Goodwin Lasiter Strong
  • Contract Amount:$236,500
  • Status: Complete
  • Updated: 10/13/23

Construction

  • Funding Source: Drainage Fee
  • Contractor: Texcon General Contractors
  • Contract Amount: $3,049,293.00
  • City Inspector: Michael Oliver
  • Status: Construction is approximately 18% complete. The wet weather has caused a slight delay.
  • Updated: 03/14/24

 

Wayside and Carter Creek Storm Rehab

City Job No. 425-D1-2028 Wayside and Carter Creek Storm Rehab

This project includes the analysis of and improvements to storm water infrastructure in various locations near Wayside Drive and Carter Creek Parkway.

General Information

  • Project Manager/City Contact: James Hayes, EIT

Design

  • Funding Source: General Fund
  • Design Engineer: Gessner Engineering
  • Contract Amount: $110,000
  • Status: The design is approximately 60% complete. During the public meeting, it was determined that the location of the project may not be the most effective area. A proposed scope change to include a separate area at no additional cost was proposed to engineering. The contract amendment is to be presented at the April council meeting.
  • Updated: 03/13/24

Feedback Form: Share Your Thoughts

Construction

  • Funding Source:  General Fund
  • City Job No.  425-D1-2028
  • Contractor: TBD
  • Contract Amount:  TBD
  • City Inspector: TBD
  • Status:
  • Updated:

 

South College Avenue Stormwater Detention Pond

City Job No. 425-DE-2016 

General Information

  • Project Manager/City Contact: Brianna Groves, P.E., C.F.M
  • Alternate City Contact: Paul Kaspar, P.E., C.F.M.

Design

  • Funding Source: 2022 Bond Fund
  • Design Engineer: Goodwin Lasiter Strong
  • Contract Amount:$417,600.00
  • Status: Complete
  • Updated: 10/13/23

Construction

  • Funding Source: 2022 Bond Fund
  • Contractor: Norman Construction Services
  • Contract Amount: $869,427.00
  • City Inspector: Alan Mitchell
  • Status: Complete
  • Updated: 03/13/24

 

Carriage Hills Detention Pond

City Job No. 425-D2-2217

General Information

  • Project Manager/City Contact: Eric  Blackburn, E.I.T.
  • Alternate City Contact: Paul Kaspar, P.E., C.F.M.

Design

  • Funding Source: Drainage Utility Fund – Fund 245
  • Design Engineer: Goodwin Lasiter Strong
  • Contract Amount:$13,100
  • Status: Complete
  • Updated: 10/13/23

Construction

  • Funding Source: Drainage Utility Fund – Fund 245
  • Contractor: Norman Construction Services
  • Contract Amount: $228,150
  • City Inspector: Max Dimas
  • Status: Construction is substantially complete.
  • Updated: 03/13/24

 

Briar Creek Floodplain Modeling

City Job No. 425-D1-0004

Through this contract, the Consultant will update the rainfall and runoff generation (hydrologic) and floodplain (hydraulic) modeling for Briar Creek, using updated topographic information as well as more accurate information related to the Carter’s Creek floodplain which significantly affects this watershed. The results of the updated models will be provided to FEMA for the Letter of Map Revision (LOMR) process to update the community Flood Insurance Rate Maps.

Briar Creek Project Map in PDF Format

General Information

  • Project Manager/City Contact: Paul Kaspar, P.E., C.F.M.

Design

    • Funding Source: Drainage Fee
    • Design Engineer: Mitchell & Morgan
    • Contract Amount: $32,200.00
  • Status: FEMA Submittal.
  • Updated: 03/07/2022