Street and Sidewalk Projects

City Projects

City and TxDOT Partnership Projects

City Projects

Woodville Road Reconstruction Phase 1

City Job No. 332-DE-2302

Phase One of the Woodville Road Reconstruction will convert the street from an open ditch roadway to curb and
gutter and storm sewer along with replacing other utilities from North Texas Avenue to Old Hearne Road.

Woodville Road Project Area Map

General Information

  • Project Manager/City Contact: Brianna Groves, P.E., C.F.M.
  • Alternate City Contact: Paul Kaspar, P.E., C.F.M.

Design

  • Funding Source: Solid Waste Enterprise Fund to be reimbursed by 2024 Bond Fund
  • Design Engineer: RME Consulting Engineers
  • Contract Amount: $296,000
  • Status: In design.  Design is currently on hold until further land acquisition is complete.
  • Updated: 03/13/24

Construction

  • Funding Source: General Fund
  • Contractor: TBD
  • Contract Amount: TBD
  • City Inspector: TBD
  • Status: Project is still in design
  • Updated:

 

Old Hearne Road Widening – Phase 1

City Job No. 332-DE-1506

Project includes the surveying and engineering design for the widening and reconstruction of Old Hearne Road from Wilhelm Drive to Texas Avenue and a short section of Sims Ave from Texas Avenue to the railroad tracks.   The roadway design will convert the existing open ditch sections within the project limits to curb and gutter pavement with sidewalks for increased pedestrian safety. Utility improvements consist of 4300 feet of sanitary sewer line replacements and 5500 feet of waterline replacements.  Additionally, there will be a new traffic signal installed at the intersection of Old Hearne Rd and Texas Avenue with ADA facilities, enhanced pedestrian features, and crosswalk striping.

Old Hearne Road Project Map in PDF Format

General Information

  • Project Manager/City Contact: Sam Vernon, P.E., C.F.M.
  • Alternate City Contact: Paul Kaspar, P.E., C.F.M.

Design

  • Funding Source: General Fund
  • Design Engineer: Jones & Carter
  • Contract Amount: $765,000.00
  • Status: Design is 100% complete.
  • Updated: 04/11/2022

Construction

  • Funding Source: General Fund
  • Contractor: Larry Young Paving, Inc.
  • Contract Amount: $7,618,127.00
  • City Inspector: Kurk Fowler
  • Status: Construction is currently at 80% complete.
  • Updated: 03/13/24

 

Old Hearne Rd Extension (Indian Trail to SH6)

City Job No. 332-DE-2201

The Old Hearne Road Extension project will construct approximately 1800 LF of roadway between Indian Trail and Earl Rudder Freeway, and approximately 500 LF of BRAC roadway from Old Hearne Road into the park and connecting to the future BTU administrative building site.

 General Information

  • Project Manager/City Contact: Eric Blackburn, EIT

Design

  • Funding Source: 2020 Bond Fund
  • Design Engineer: Gessner Engineering LLP
  • Contract Amount: $152,500
  • Status: 60% design was reviewed by City Staff Mid December 23′ and comment were returned to the design engineer for revisions.
  • Update: 03/13/24

Construction

  • CIP Budget: TBD
  • Funding Source: TBD
  • Contractor: TBD
  • Contract Amount: TBD
  • City Inspector: TBD

 

Commerce Street Reconstruction Ph 1

City Job No. 332-DE-1620

Design

  • Funding Source: Transportation Fund
  • Design Engineer: RME Consulting Engineers
  • Contract Amount: $91,400
  • Status: Complete
  • Update: 10/13/23

Construction

  • Funding Source: Transportation Fund
  • Contractor: Norman Construction Services LLC
  • Contract Amount: $2,957,540.00
  • City Inspector: Kurk Fowler
  • Status: Construction is approximately 12% complete. ATMOS gas will begin their relocation within the next 2 weeks.
  • Updated:  03/13/24

 

South College Avenue Reconstruction- Phase 1

City Job No. 332-DE-2016

Project includes the reconstruction of approximately 4,300 LF of South College Avenue from West Villa Maria Road to Carson Street. This includes replacing and upgrading underground storm sewer, water, and sanitary sewer lines along the project limits. Additional offsite sanitary sewer will be constructed with this project. A 10-12-foot wide shared use path will be constructed along the west side of South College Avenue and a 6-foot wide sidewalk will be constructed along the east side of South College Avenue. This project will improve the  drainage by upgrading the storm sewer network and constructing stormwater detention ponds to help alleviate flooding in the surrounding area. Aging water lines, sanitary sewer lines, and pavement will be replaced, which will upgrade infrastructure systems and reduce maintenance.

South College Avenue Project Map in PDF Format

Please Submit Questions/Comments

Interactive Story Map

General Information

  • Project Manager/City Contact: James Hayes, EIT
  • Alternate City Contact: Paul Kaspar, P.E., C.F.M.

Design

  • Funding Source: General Fund
  • Design Engineer: Goodwin Lasiter Strong
  • Contract Amount: $528,000
  • Status: The Design is complete.
  • Updated: 10/13/23

Construction

  • CIP Budget: $9,400,000 (General Fund)
  • Funding Source: General Fund, Water Fund, & Sanitary Sewer Fund
  • Contractor: Larry Young Paving, Inc
  • Contract Amount: $15,990,929.00
  • City Inspector: Alan Mitchell
  • Status: Project is currently paused. The redesign to remove medians has been preliminarily completed. The revisions will be presented to City Council at the April meeting.
  • Updated: 03/13/24

Detour Route – South College Reconstruction Phase 1 effective May 22nd 2023 – November 2023

 

Hardy Weedon Traffic Signal & Road Improvement

City Job No. 332-DE-2203

Design

  • Funding Source: General Fund
  • Design Engineer: Bleyl Engineering
  • Contract Amount: $173,000
  • Status: Signal design is approximately 50% complete. Roadway design has begun.
  • Update: 03/13/24

Construction

  • Funding Source: TBD
  • Contractor: TBD
  • Contract Amount: TBD
  • City Inspector: TBD
  • Status:

 

W. Villa Maria Shared Use Path & Lighting

City Job No. 350-D8-2108

Design

  • Funding Source: TASA Grant/2022 Bond Fund
  • Design Engineer: Goodwin-Lasiter-Strong
  • Contract Amount: $323,000
  • Status: Complete
  • Update: 03/13/24

Construction

  • Status: Construction is approximately 30% complete.
  • Updated:  03/13/24

 

City and TxDOT Partnership Projects

 

William J. Bryan Pkwy (FM 158)  Improvements

City Job No. 700-DE-1710

The City of Bryan, in partnership with the Texas Department of Transportation and the Bryan/College Station Metropolitan Planning Organization, is planning safety and mobility improvements for William J. Bryan Parkway from Texas Avenue to SH 6.

This project will include improving pedestrian, cyclist and vehicular access and safety; reducing chronic traffic congestion along the corridor; improving access to Sue Haswell Park; and improvements to utilities and drainage.

WJB Project Map in PDF Format

Click Here to Learn More About the William J. Bryan Pkwy Improvement Project

General Information

  • Project Manager/City Contact: Brianna Groves, P.E., C.F.M.
  • Alternate City Contact: Sam Vernon, P.E., C.F.M.

Design

  • Funding Source: Transportation Fee; General Fund
  • Design Engineer: Binkley & Barfield
  • Contract Amount: $1,024,119.66
  • Status: Design is 100% complete.

Construction

  • Funding Source: TxDOT Project
  • Contractor: Larry Young Paving
  • Contract Amount: TxDOT Project
  • Status: Construction is currently in progress.
  • Updated:03/13/24

Texas Avenue Infrastructure Improvements

City Job No. 332-DE-1904

Project consists of improvements to Texas Ave from Old Hearne Road to University Drive.

General Information

  • Project Manager/City Contact: Kelly Sullivan, P.E.
  • Alternate City Contact: Paul Kaspar, P.E., C.F.M.

Design

  • Funding Source: General Fund, Transportation Fund
  • Design Engineer: Lockwood, Andrews & Newman, Inc.
  • Contract Amount: $2,231,146.16
  • Status: All phases are complete.

Construction

  • Funding Source: TxDOT/MPO
  • Contractor: – Larry Young Paving, Inc.
  • Contract Amount: TxDOT project
  • City Inspector: TxDOT project
  • Status:  In progress
  • Updated: 03/13/24